Skip Ribbon Commands
Skip to main content
We use our own cookies and others by third parties to “store and access information regarding language, browser type, and other basic features defined by the user, as well as to trace and analyze the activity carried out, aiming at improving and providing our services in a more efficient and customized fashion”. If you keep navigating, we will consider you accept their use. You may change the configuration or obtain more information here.
New Facilities at Integra2 Asturias

Integra2 Asturias has moved to a new warehouse on the Silvota Industrial Estate in Barganiza.  The facilities are 100% temperature controlled and have 1,800 metres squared of warehousing space as well as a further 1,800 of exterior space for the fleet.  Integra2 Asturias has 5 insulated docking bays for trailers and 8 light docking bays for a total of 24 vehicles that make up the 100% refrigerated pick up and distribution fleet.
The warehouse is fully climate controlled with a pre-storage area of 1.087 metres squared, a 1300 metres squared storage area dedicated to perishable gourmet food and another medicine storage area of 145 metres squared that is temperature controlled and monitored between +2 and +8ºC, 24 hours a day, 7 days a week.

In line with the GDP network distribution service for the pharmaceutical sector, in addition to the areas dedicated to the temporary storage in transit of thermolabile products, the new facilities will have a separate area of access for laboratory representatives where they can remove, handle and manage the shipments of product samples, promotional material, etc..

The rest of the facility is perfectly separated and has 168 metres squared of offices, toilets, changing rooms for drivers, and an area dedicated to products that do not require temperature control.